Compare silent diesel generator requirements for commercial premises, factories and warehouses. Confirm PRP and ESP, components and European delivery scope before ordering.
100 kVA / 80 kW PRP · 110 kVA / 88 kW ESP · Cummins 6BT5.9-G1 · silent · 400 V · 50 Hz · 3 phase
Minimum order: 1 units
Generator price only. Delivery and optional items quoted separately. Final price depends on the confirmed configuration and quantity.
Prices are taken directly from the corresponding EPOS Alibaba product page, with no markup. The website configuration follows that listing. Price tiers apply to the stated purchase quantity.
Generator listing price. Delivery is negotiated separately. Taxes, ATS, installation and unloading are not included in this displayed generator price; any additional items are quoted separately.
Fujian Epos Electric Machinery Co., Ltd. · 2026-10-12
Exact EPOS configuration, currency, quantity pricing and minimum order are not yet verified.
Generator price only. Delivery and optional items quoted separately. Final price depends on the confirmed configuration and quantity.
Prices are taken directly from the corresponding EPOS Alibaba product page, with no markup. The website configuration follows that listing. Price tiers apply to the stated purchase quantity.
Delivery, taxes, ATS, installation and unloading are quoted separately unless explicitly included in the matched listing. Port and door delivery require a separate quotation.
50 kVA / 40 kW PRP · 55 kVA / 44 kW ESP · Weifang ZH4105ZD · silent · 400 V · 50 Hz · 3 phase
Minimum order: 1 units
Generator price only. Delivery and optional items quoted separately. Final price depends on the confirmed configuration and quantity.
Prices are taken directly from the corresponding EPOS Alibaba product page, with no markup. The website configuration follows that listing. Price tiers apply to the stated purchase quantity.
Generator listing price. Delivery is negotiated separately. Taxes, ATS, installation and unloading are not included in this displayed generator price; any additional items are quoted separately.
Fujian Epos Electric Machinery Co., Ltd. · 2026-10-12
50, 100 and 200 kVA: enquiry targets, reviewed for your site
Choose a prime-power enquiry target, then describe your actual loads and site. At a specified rated power factor of 0.8, the three targets correspond to 40, 80 and 160 kW. These are project requirements, not verified supply ratings. Standby power, final components and site suitability require separate supplier and engineering confirmation.
50 kVA silent generator: check starting loads
For a 50 kVA prime-power enquiry, list the equipment that runs together and how pumps, refrigeration or air-conditioning motors start. Include the required frequency, voltage and phase. Floor area alone cannot establish generator size. Request a sound-attenuated enclosure and a noise report that states the measurement distance, electrical load and test method.
100 kVA silent generator: plan backup and switching
For a 100 kVA prime-power enquiry, separate ordinary loads, motor starting loads and equipment that cannot tolerate an interruption. State whether automatic mains-to-generator transfer is required. An ATS switches the source; it does not by itself provide uninterrupted power. Final generator sizing, ATS specification and any UPS arrangement require project review.
200 kVA silent generator: review motor steps and site limits
For a 200 kVA prime-power enquiry, provide the largest motor nameplate, starting method, loads already running and the intended start sequence. Include site temperature, altitude, enclosure space and ventilation limits. A nominal kVA rating alone does not confirm motor-starting capability or output at the installation conditions.
Compare the same configuration and technical evidence
Ask each factory to identify the complete generator, engine, alternator and controller models. Match the quotation, component list, dated specification and exact-configuration photographs. Keep open-set and enclosed dimensions separate, and request packing dimensions and shipping gross weight. Factory reference documents describe their stated configurations; they do not confirm the equipment offered for your project.
A generator, matched filter kit and delivery in one enquiry
Our factory in China customizes the generator to your project requirements, with equipment and delivery planned together. A complimentary oil and fuel filter kit is included under the stated policy; part numbers, quantities and compatibility are confirmed for the final engine in the quotation and packing list. Provide the destination, delivery address and unloading conditions. Freight, timing, import responsibilities and warranty terms are agreed in writing.
Custom generator questions
What information starts a custom generator enquiry?
Provide the application and loads, PRP or ESP basis, frequency, voltage, enclosure, component preferences, quantity, delivery location and target date. Add daily hours, noise target and measurement distance, size limits and ATS, parallel or remote monitoring needs where known.
Are EY reference IDs own-brand generator models?
No. EY is the website and business identifier. The codes organize enquiry references, not own-brand machines or confirmed stock. The supplier must confirm the final manufacturer, configuration and equipment identity.
How is the silent configuration confirmed?
State the target sound level and measurement distance, operating load and installation limits. The supplier needs to review the enclosure, ventilation and proposed configuration; the word silent is not a guaranteed noise rating.
Can preferred components and alternatives be requested?
List preferred engine, alternator and controller brands or models and acceptable alternatives. These are requests for factory review, not confirmed component availability or manufacturer authorization.
How is European delivery agreed?
Send the country, postcode, packed dimensions and gross weight, site access and unloading details. The written quotation identifies the transport scope, taxes, installation and local-service responsibilities. Final routes, costs and timing require confirmation.
What is the kW equivalent of 50, 100 or 200 kVA?
At a specified rated power factor of 0.8, the enquiry targets are 40, 80 and 160 kW. These conversions are not confirmed equipment ratings. Final capacity must cover the agreed duty, starting loads and site conditions.
Does a silent generator have a guaranteed dB(A) value?
No universal sound value follows from the name silent. Agree the sound-pressure or sound-power target and applicable measurement conditions, then obtain a report for the proposed enclosure and configuration.
Is a 100 kVA standby generator a 100 kVA prime generator?
No. The same number on different duty ratings is not an equivalent supply requirement. Request the proposed model’s PRP and ESP values separately, together with their operating limits.
Enable JavaScript for interactive selection and enquiry forms.