EY GENPOWER
Help Me Choose a Generator
Record your application, electrical requirements and site conditions for a custom generator enquiry. Final sizing requires engineering and supplier review.
Step 1: identify the job and power basis.
Describe whether the generator will provide backup or routine power, the destination and requested timing. State PRP or ESP separately; a standby rating is not interchangeable with the prime rating.
Step 2: describe loads and electrical requirements.
Record running loads in kW or kVA, power factor where known, motor starting, frequency, voltage and phase. Share a load list when available. The guided tool prepares information for engineering review; it does not approve a generator size.
Step 3: confirm the site and supply request.
Add installation type, ventilation and access limits, ambient temperature, altitude, noise target and measurement distance. Include ATS, parallel operation, fuel autonomy and component preferences, then carry your project brief to the enquiry form.
Enable JavaScript for interactive selection and enquiry forms.